Gazprom board member Kirill Seleznyov during the installation of the first gas turbine at the Adler Thermal Power Plant.01.10.2010#771834
General Director of Mosenergo Yury Dolin, Gazprom board members Denis Fyodorov, Igor Golenishchev, Kirill Seleznyov, Matvey Geller (from left to right) during the installation of the first gas turbine at the Adler Thermal Power Plant.01.10.2010#771832
View of the construction site of the Adler Thermal Power Plant before the installation of first gas turbine.01.10.2010#771205
View at the ice palace being built for Sochi Olympics from the Adler Thermal Power Plant.01.10.2010#771204
Gazprom board member Kirill Seleznyov signing the spanner after the installation of the first gas turbine at the Adler Thermal Power Plant.01.10.2010#771203
Gazprom board member Kirill Seleznyov during the installation of the first gas turbine at the Adler Thermal Power Plant.01.10.2010#771202
Gazprom board member Kirill Seleznyov (2nd to the right) examining the construction site of the Adler Thermal Power Plant before the installation of the first gas turbine.01.10.2010#771200
Preparing for the installation of the first gas turbine at the Adler Thermal Power Plant.01.10.2010#771199