The Bureya hydropower station is being built for nearly 30 years now. Its two power units are operating and the third one is to be commissioned in November 2004. The depth of the water reservoir near the dam has already reached 120 meters. When the water reservoir is filled, its depth will be close to 200 meters.
- Categories: Economy, Business & Finance
- Location: Amur region, Russia
- Event date: 06.10.2004
- Date published: 04.10.2005
- Author: Viktor Chabarov
- Source: Sputnik
- Credit: Sputnik
- Original: Digital
- Media: JPEG, 5611x3321px, 16.3Mb